Upgrade your kitchen and interior renders with this Modern Digital Mini Oven 3D Model + Revit Family. Designed with sleek aesthetics and realistic detailing, this digital oven 3D model is perfect for contemporary kitchen visualizations, appliance catalogs, and high-end interior projects. The oven 3D model features a digital display, functional buttons, and a compact design, making it an excellent addition to any modern space.
This product also includes an oven Revit family, ensuring seamless integration into BIM projects. To achieve the best visual quality, you will need Vray (and the VRSCENE file) when rendering in Revit. Without Vray, the model will appear faceted due to Revit’s rendering limitations. Ideal for architects, interior designers, and 3D artists, this model enhances any kitchen scene with professional-grade detail.
Looking for other kitchen appliances 3D models? Click HERE to see all the options we have in stock.
For detailed technical information and included formats of this oven 3D model that also includes an oven Revit family, please read the sections below.
Before purchasing our Revit families and 3D models, make sure you have a software like Winzip or Peazip to unzip files since you will be provided with zip format files.
Digital mini oven Revit family. This Revit family can be rendered in Revit and materials placeholders are set up so you can assign your own materials/textures, but this oven Revit family is meant to be used as a Vray Proxy.
- Parametric: No
- Hybrid*: Yes
- Compatible with: Revit 2016 and higher.
- Family type: Generic Model Work Plane-Based
- Materials/textures: No, but material placeholders are set up.
- Approximate file size (set): 0.59 MB
- File format: .rfa
Use this highly detailed Modern Digital Mini Oven 3D Model + Revit Family to make your kitchen renders stand out. Every piece of this oven 3D model has been carefully modeled (including the interior) so you can benefit from a photoreal-looking mini oven in your renders.
- Compatible with: 3D Max 2016 and higher.
- Materials/textures: Yes, for Vray only.
- UV Mapped: Yes
- Geometry: Polygonal
- Vray version: Vray Next, update 3 and higher
- Approximate file size: 3.89 MB
- File format: .max
This Modern Digital Mini Oven 3D Model + Revit Family includes a Blender version for Cycles/Eevee as well as a Blender version for Vray.
- Compatible with: Blender 2.83 and higher
- Materials/textures: Yes
- UV Mapped: Yes
- Geometry: Polygonal
- Vray version: 2.79 and higher
- Approximate file size: 5.25 MB and 4.44 MB (Vray version)
- File format: .blend
FBX, OBJ, VRSCENE, VRMESH






















Reviews
There are no reviews yet.